Couple notes before I go further with pics - the walls inside are wall papered. Figured it's a fairly inexpensive way to get the wall finished and hopefully it will survive a while. I probably should have bought a super duper heavy duty wallpaper as this one might not survive too long BUT it's there for now.
Also in process of building the design slightly changed. The location of the bathroom and the kitchen/fridge moved a bit.
As you can see the bathroom will be immediately on the left. The fridge further in. Kitchen will be accessible from the outside (ala teardrop) with a small window that will allow for fridge stuff to be placed from the inside to the counter on the outside from inside of the trailer.
So after painting it it got loaded up with an EMPTY interior and just a mattress inside and towed it to Yosemite
After returning work slowly continued but the trailer is far from being finished. So far it got two roof vents with fans. Fans are not connected yet but I will have them running in the next week or so since in 2 weeks it's going to Sequoia and Yosemite again. I will wire the fans so that they can run in both directions depending on how the switch is flipped.
Anyways getting back to the trailer. Took it out to Joshua Tree in the spring to check out the cacti in bloom...
Things left to do:
- finish the front - at the moment things are loosely disorganized. I finally had some time to mount the base for the Jerry can and attach the spare tire. Now I want to work on putting a big water canister there (spare/extra water) and maybe have a small locking supply box.
- finish the bathroom - for now the casette toilet is attached to the floor and that's it. No sink, no running water for hand washing.
- kitchen - that's a whole big can of worms..... gotta wait for pops to come back from Europe and we'll tackle the project in the fall. Hopefully we won't get rained out as the trailer does not fit into the garage.
- solar panel hookups so that I can charge the house battery
Things that are done:
- fridge is mounted and working (pics to follow)
- bed frame is done and working along with a small table (pics to follow)
- USB power outlets throughout - they are useful for charging smart devices along with couple flex neck lights that I got. I even have a USB powered fan.
And well... more items will follow... it will most likely be a continuous work in progress.