Heads are on, timing back together and rockerlocks installed. Im about two good hours from being finished with the motor and then I get to put the front end together.
Motor is done. Runs like a champ. Winch is installed. 50 inch light bar is installed. Roof rack is installed. As soon as i get a nice dry day i will post some pictures.