Chris Cordes
Expedition Leader
I'm an unusual case. We received a media discount which keeps us behind normal customers (as it should be) We also went back and forth on many design characteristics before finalizing. All told between rough agreement on the design to ship date probably four months? We were still doing dimensions on the swing out box like three weeks back.What I would really like, is a copy of my Shrockworks for a Super Duty or F150. Absent that, I think I'd go with an ARB front and Buckstop rear like you're doing. It's good that they are willing to do some custom stuff. How long has it taken since you first put in the order?
View attachment 391826
They are going on Martyn's 7.3 F250 at AT OverlandLooks a lot better without the running boards.
So what did the BFGs go on?
This build is exactly what i have been looking for. I have a 2000 Ex 7.3 4x4 as well that i want to build up for over landing here in Texas. Thanks for all the details!
Glad I could help! What part of Texas?