The new (upper) floor is sealed, and then glued down to the frame and floor insulation, drying overnight with a bunch of stuff sitting on it to "clamp". The wall insulation is all cut to size and installed. The door is coming along nicely, just needs glass installed, Dicor on the outer trim, and...