Got the floor cut, routed, glued, clamped and weighted!
Here's how I decided to join the two floor pieces. I cut a stair step over 3 inches. Cut the same feature in the other panel. Tons of six 10 epoxy and squish together. This is a mashup of various joining ideas I had seen...and was doable with tools I already have. I figured there was plenty of surface area and the open honeycomb in the middle step would offer a lot of mechanical keying with all of the epoxy in there.
Here it is all clamped up and weighed down. I still need to cut it to length but i figured it would be best to do that after the seam was epoxied so I can be sure it's exactly the right length. I will also have the opportunity to square it up if needed.
This joint will be finished off with a layer of 6" wide, probably 6oz, fiberglass on both sides. I may run two wide strips of 1/2" plywood perpendicular to the joint for extra reinforcement for the floor as well as the mounting points. We'll see!
Sent from my iPhone using Tapatalk