Well, looks like I've forgotten to post for a bit. I don't have anything complete that I've started on, but forward progress is still progress.
The toilet hider and side storage area are just about complete. I have the floor pan drawing for the toilet but need to have it cut, bent, and powder coated. Once I have that back I can get it mounted with some Accuride locking draw slides. Last thing will be making a door to the cover the front, and figure out some kind of a wheel system to support the front when it's supporting weight.
The cooler storage is in the same boat. I have the floor pan drawn but need to have it cut, bend, and powder coated so I can install it. I also need to find a solution for the doors on this, but that shouldn't be very difficult.
The shelf and counter only need to be sanded, and sealed. I ended up using butcher block for both, and pick them up at my local Home Depot. The shelf will end up with some kind of a small lip on it, and I'm also going to cut a thin piece to act as a back splash.
Flooring is also installed.