uscg2008
Explorer
So since we are on holiday routine till the 6th of jan and only standing 1 in 4 duty plans are: to pull my trailer into the hangar to dry out (we have had pretty much 2 straight months of rain everyday), remove the inside panels, then take some measurements for insulation, then start to wire in and mount my 5 exterior (3 on the rightside and 2 off the rear) LEDs that I got from blitzpro. Have to see how much I can actually get done with my hand still healing up from having a tumor moved in November.
Pile of crap that needs to go in
Pile of crap that needs to go in