Work has progressed slightly, The hydraulic leveling system is now finished! engage the PTO and operate the switches on the remote control to lower each leg as required (one in each corner) to level up, it will also lift the wheels for tyre changing, or to put traction aids under the wheel.
The box body is now fully assembled, complete with windows, but I am still waiting for the door to arrive.
There are plenty of storage lockers, but they will need painting, along with the cab.
I have extended the rear of the chassis, and fitted a LPG tank and an extra fuel tank between the chassis rails along with the house batteries, I have also fitted a larger running fuel tank.