Interesting, that's the first I've heard of it. I wonder if the ~4 month lead time has some vendors shying away from them. Being that they're made by AxleTech, more commonly known for the insane axles found under MRAP's, I imagine the setup will be bullet proof. You're right about the price tag, though. I think the customer is still reeling from that purchase .
Frame is gone and off to the sandblasters, and the freshly painted and bedlined body now takes its place. We went with a color matched liner which really came out awesome. Aside from water tank design work it's kind of a waiting game for now until everything comes back, upon which I'll test fit all of the tanks and
then send it out one final time to get powdercoated for final assembly.