With panels drying and now being unexpectedly out of glue I turned to mounting the frame for cabover section. Didn’t get ver many pics of this process as it was a precarious one with lots of wet glue and floppy parts. I’ll try and snag some better shots before I mount the other panels...hopefully tomorrow. 
First panel installed:
	
	
	
		
		
		
			
		
		
	
	
		 
	
Both side frames on and clamped up:
	
	
	
		
		
		
		
	
	
		 
	
	
			
			First panel installed:
 
	Both side frames on and clamped up:
 
	 
				 
	 
	 
	 
 
		 
 
		 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
	 
 
		