LandOps
Observer
The advanced teams recently conducted a connectivity exercise on the Mojave Road.
We ran a seventy mile loop with two teams and connected via the mesh network, APRS and 2m/70cm cross band repeater.
This was a Friday the 13th setup and a Saturday the 14th route.
Here's the video;
[video]https://youtu.be/H40VjiRsfVM[/video]
We ran a seventy mile loop with two teams and connected via the mesh network, APRS and 2m/70cm cross band repeater.
This was a Friday the 13th setup and a Saturday the 14th route.
Here's the video;
[video]https://youtu.be/H40VjiRsfVM[/video]