Well, the wiring is about 80% completed.
Once all of the runs that cross over through the rafters was completed I decided that it was time to add a ceiling.
At this point all I can claim is that I am really good at building boxes......Lots of boxes........
I added provisions for a solar panel or to while wiring the overhead.
To be honest , I haven't even thought about that aspect yet.
As I have no experience with them , any advice would be appreciated....
The lighting will be converted to all LED bulbs once the box is in service.
I have decided to either run a blue flame or catalytic heating system.
By doing this I save the room designed for the big Duotherm . It will be converted into a storage locker for my Yamaha 1000 watt geny.
I have a 1000 watt cin wave inverter that will go into the system just to charge my lap top.
The total amp draw should be minimal enough to only need 1 12 volt deep cycle battery on board.