I have a NV4500 4x4 transmission I will be swapping with my 2wd NV4500. From what I'm gathering, the only issues I would be facing is shortening the gas tank and the drive shaft. Everything else is direct bolt up..
My local weld shop seemed like they would be willing to tig weld my removed diesel tank, but was concerned about the gauge thickness of tank material.. The guy mentioned it might be like welding a tin can..
1)Does anyone know what gauge thickness ford used for the fuel tanks?
2)How much space should I allow between the T-case back, and the tank? 2"?
3)Are there any issues cutting off the front, like any fuel pickups, or tank fuel level floats in the front of the tank?
4) Can the tank be cut with heavy duty tin snips to prevent tank contamination? Or should I plan on allot of diesel rinsing after the grinding and welding?
Thanks!
My local weld shop seemed like they would be willing to tig weld my removed diesel tank, but was concerned about the gauge thickness of tank material.. The guy mentioned it might be like welding a tin can..
1)Does anyone know what gauge thickness ford used for the fuel tanks?
2)How much space should I allow between the T-case back, and the tank? 2"?
3)Are there any issues cutting off the front, like any fuel pickups, or tank fuel level floats in the front of the tank?
4) Can the tank be cut with heavy duty tin snips to prevent tank contamination? Or should I plan on allot of diesel rinsing after the grinding and welding?
Thanks!