Rutdigger
Watch This!
More work completed
Got some more work done on the awning in the past few days. Fabric arrived yesterday so I started to prepare the frame for patterning. I gotta tell ya; it was a major pain the butt to pattern alone! Sticky tape and plastic don't like each other..lol.
Anyway, here is the frame with the patterning tape applied...I noticed that I had a hinge that was not drilled square allowing one side to droop and welding caused a curve in the frame.....I will have to fix that before I mount it on the trailer.
This is map "per say" of the pattern quadrants:
Cutting out the patterns and adding in the seam allowance notes to the edges:
Next step will be to transfer the patterns to the fabric and then cut those out, get them basted and sewn. Add in the risers strike pads and sew in reinforcing patches. Blah blah blah....
Got some more work done on the awning in the past few days. Fabric arrived yesterday so I started to prepare the frame for patterning. I gotta tell ya; it was a major pain the butt to pattern alone! Sticky tape and plastic don't like each other..lol.
Anyway, here is the frame with the patterning tape applied...I noticed that I had a hinge that was not drilled square allowing one side to droop and welding caused a curve in the frame.....I will have to fix that before I mount it on the trailer.
This is map "per say" of the pattern quadrants:
Cutting out the patterns and adding in the seam allowance notes to the edges:
Next step will be to transfer the patterns to the fabric and then cut those out, get them basted and sewn. Add in the risers strike pads and sew in reinforcing patches. Blah blah blah....