Howdy all, it's been a while!
I'm writing from Laos. Not your typical post location. Long story short I have quit my job and spent much of the winter traveling through Asia. My priorities have changed to say the least. Towards the end of November I finished my doors, weather seals and exterior details to get on the road. Transitions between the Flippac and the rest of the structure are practically seamless! Once the paint goes on it will be very difficult to tell that it's two pieces.
As I look ahead, I see a high likelihood of selling the build - as is. She's sitting in storage in Salt Lake waiting for me to degrease and apply the marine paint I've purchased. If I find someone interested, I will likely sell upon my return to the states in early May. I've documented my receipts and the bulk of my parts list for convenience. The curb weight is 800lb now, build components and welding labor have cost me $4,400. Estimated 250 hours of work. Quite sad actually. But ultimately an amazing learning experience working with glass and epoxy.
My server here isn't fast enough to insert photo attachments. Try the Google Drive link below and scroll to the bottom for the most recent photos.
https://drive.google.com/open?id=1Vmpsab-0Pif54cg4qL5ykkZd8C8_-FyJ
Please email to
tmcdon890@gmail.com for inquiries.







