An update on the worlds slowest expedition truck build, after much scrimping and saving, I have managed to get my super singles, VASS engineering approval, a roadworthy certificate and been to VicRoads and managed to get my truck registered.
I am still working on the accommodation cabin in the shed, plenty to do there, although the 240 volt wiring has been certified by an electrician, I'm fitting the water tanks between the truck's chassis rails, I'll fill them up, that can be a bit of durability testing while I drive the truck around. Hope to provide another update in a shorter amount of time than this one.