Dave will begin shipping the Tan bags sold (27 total) as soon as the GB closes. The green and black are in production and Dave expects to have them in about a month.
A month. Is that mean I won't get mine on time for my trip?
Dave,
Can you "squeeze" one green one for me?
Thank you,
Tyler