I am trying to plan out the proper battery and charging system for my rig and have a few questions. I have been reading up all I can but cant seem to find an answer. I reached out to CTEK directly but I haven't received a response. Any help would be greatly appreciated.
Here is my plan as it stands right now:
Already Installed
Alternator: 1 Wire(self exciting) – 200 Amp peak, 100 Amp at Idle
Battery Management
CTEK 100A Off Road
• 250S Dual
• Smartpass
• Battery Monitor
Inverter
2000W Pure Sine Inverter (TBD)
Batteries
Starting Battery - DEKA Intimidator Group 31 AGM
House Batteries – 2 6V Lifeline GPL-6CT 300AH Deep Cycle AGM
Solar
(2)-80-100 watt panels, possibly more in the future.
1. My main question is about my high output one wire(self-exciting) alternator? Will there be any issues using this with the CTEK controller or does the unit just regulate the amperage down to the maximum output of the controller.
2. Is the solar capacity still limited to the 20A of the D250S or is it increased due to the Smartpass. If it is limited to 20A am I correct in assuming I could run a 12v system with up to 240watts of solar before I was maxing out the amperage?
3. What will I need if I want a shore power connection, will I need to upgrade to an inverter/charger instead of just an inverter?
Again any insight you can give me would be a huge help, let me know if I left out any key details
Here is my plan as it stands right now:
Already Installed
Alternator: 1 Wire(self exciting) – 200 Amp peak, 100 Amp at Idle
Battery Management
CTEK 100A Off Road
• 250S Dual
• Smartpass
• Battery Monitor
Inverter
2000W Pure Sine Inverter (TBD)
Batteries
Starting Battery - DEKA Intimidator Group 31 AGM
House Batteries – 2 6V Lifeline GPL-6CT 300AH Deep Cycle AGM
Solar
(2)-80-100 watt panels, possibly more in the future.
1. My main question is about my high output one wire(self-exciting) alternator? Will there be any issues using this with the CTEK controller or does the unit just regulate the amperage down to the maximum output of the controller.
2. Is the solar capacity still limited to the 20A of the D250S or is it increased due to the Smartpass. If it is limited to 20A am I correct in assuming I could run a 12v system with up to 240watts of solar before I was maxing out the amperage?
3. What will I need if I want a shore power connection, will I need to upgrade to an inverter/charger instead of just an inverter?
Again any insight you can give me would be a huge help, let me know if I left out any key details