Well I did some work on this trailer this weekend.
1st I had new tires placed on the 72 Ford rims I got off craigslist. Old tires were 10 years old and one had a small leak. BTW Tire shops around here will not even air up 10 year old tires. So went with some 235/75R15 Goodyear Wrangler radials. This is just temporary until I finally get my 5x5 custom axle.
2nd: I finished welding up the tailgate sheeting and adjusted the hinges as there was some minor binding after installing the sheeting. Then just did a quick primer and Black coat of paint. Installed the latches and this is as far as I plan to go for the month.
In Nov, I will dis-assemble the tube from the frame and have it bead blasted. Then off to a Auto body shop to have the dents and bends fixed as much as possible then painted. I'm guessing this will all take till Feb to get completed. From there I will make a lid. By February, I will have already extended the front out for a Tool box, and installed that, plus give more room to clear the Jeep tailgate. Add a rear hitch mount.
Here is the most current pictures. Sorry there a bit dark
. I will re-take them this weekend
.