here is an update for those wondering how the camper top deploys.
Step 1. Lift lid and unload gear from tub.
Step 2: setup scissor jack stabilizer under each corner of camper. Adjust until level. (not shown in these photos)
Step 3: Stand on front platform, lift up end of top, end wall unfolds (with gas springs)
Step 4: Setup the ladder on the end of the trailer. Lift up other end of top, 2nd end wall unfolds. Cables keep walls from over extending.
Step 5: Move ladder to side of trailer. Open door on the side wall that's folded flat.
Step 6: climb into trailer (sitting in the door hole) and fold up the side wall.
Step 7: Fold up 2nd side wall. Latch walls into place on inside.
Here are some photos of the inside.
ceiling