Got the old tent mounts off, fabbed up the new tent uprights and got the top cut and fitted along with the location of the water tank figured out.
Next up:
- New sides
- remount the pump and filter and plumb
- redo wiring
- finish the trim and paint/bedline
- weld in the cross bars and get tent installed.
Here are some pics
Next up:
- New sides
- remount the pump and filter and plumb
- redo wiring
- finish the trim and paint/bedline
- weld in the cross bars and get tent installed.
Here are some pics