slimtwo
Adventurer
More progress on the trailer. I have been working on the plumbing, getting the manifold glued up, and the service line sort of laid out. Then yesterday, and today, I have been measuring and planning on how I want to lay out the electrical compartment.

I started cutting material for the actual compartment, which will house the fuse/breakers, the CETEK solar controller, and the switch panel and 12 volt cut off switches. I had to interrupt my progress however, when it started to rain. I had to see if the trailer would actually fit in the garage like I had designed it, and what do you know, it fit.


I did have to air down the suspension though, but I new that would be the case.
More later.
Happy Trails!

I started cutting material for the actual compartment, which will house the fuse/breakers, the CETEK solar controller, and the switch panel and 12 volt cut off switches. I had to interrupt my progress however, when it started to rain. I had to see if the trailer would actually fit in the garage like I had designed it, and what do you know, it fit.


I did have to air down the suspension though, but I new that would be the case.
More later.
Happy Trails!