TheMike
Adventurer
Continued from Part 2....
Just about done
Built and ready for shipping
Pallet custom built for each trailer for shipping. They build pallets like they do trailers. VERY STRONG!
Packing was done perfectly. 3 days later it arrived at the FEDEX Freight depot completely unharmed. FEDEX placed the pallet in the middle of the parking lot, I unpacked it, added air to the suspension then drove it away.
The completed setup. the trailer is actually sitting a little low compared to the Jeep. That's my fault as I don't have the correct amount of air in the trailer air bags. When it's correct, the trailer is exactly the same height as the Jeep (Both running 35 MTR's on 15x8's)
The trailer will be used almost weekly next year with plans to maybe run the Rubicon and explore the Mohave next spring. The big plans right now though is a 3 week expedition to Baja Oct/Nov 08 (just before the 08 Baja 1000). Dates are booked and now for the planning……
Just about done

Built and ready for shipping



Pallet custom built for each trailer for shipping. They build pallets like they do trailers. VERY STRONG!





Packing was done perfectly. 3 days later it arrived at the FEDEX Freight depot completely unharmed. FEDEX placed the pallet in the middle of the parking lot, I unpacked it, added air to the suspension then drove it away.
The completed setup. the trailer is actually sitting a little low compared to the Jeep. That's my fault as I don't have the correct amount of air in the trailer air bags. When it's correct, the trailer is exactly the same height as the Jeep (Both running 35 MTR's on 15x8's)

The trailer will be used almost weekly next year with plans to maybe run the Rubicon and explore the Mohave next spring. The big plans right now though is a 3 week expedition to Baja Oct/Nov 08 (just before the 08 Baja 1000). Dates are booked and now for the planning……
Last edited: