Not much to show for the week although quite a bit got done. Just nothing that stands out. Power steering pump lacked the 6mm dowel pin it pivots on, bought one a few weeks back. Got to the job, the pins are hiding, ******. Finally got up town yesterday thinking Home Depot would have some, employees had no clue what I was asking about. Up on the top side of town is a great old fashioned HW store, Plenty of selection. Pulled the pump apart and pressed the pin in place, back together and mounted. Humm, the 740mm belt is too long, not by much but will not come up to tension, ordered a 15 mm shorter one, be a week.
On top of that I started to build the fluid hose from the pump to the box. I still do not have a usable inlet fitting for the steering box, this one is larger than all the other inlet hoses I have here. I wish the original had not been tossed out before I got this rig.
Started building a longer front propshaft. Machined a sleeve a few thou tight. Need to go to another shop next to press it all together.
Got back to the trans X member, put it on the mill to make room for outer mount bushings to hold the G3 trans mount. Coming along fine till I can not get my hands on the 10mm tap, I used it recently, my last good one that is. Drats, ordered 3 more in, farggin $28 each for decent quality taps now. Maybe paint all the X member I can while I wait.
Here is the X member on the mill as I pocked an area for the threaded bushings I will install next week.
Nothing exciting, I thought I would have this fitted and welded by now. Oh, about the longitudinal welds on this, I have no clue, this rig had previously had an engine swap and they must have needed to lower the trans or something, I know nutting in my worst German accent.