What I really need is a lift and 15ft shop. Not happening any time soon though.
Got 3 of 4 brackets attached. Need to lengthen fuel lines and harness, and get that 4th bracket mounted. I ended up moving it back ~12", as that lined up with the floor beams well. And yes, I know I need a bench vise. And a milling machine, lathe, break, english wheel, hydraulic press, vertical band saw.... But a clamp and a die grinder will get me there...
I got some measurements off the bell housing for the front end model. Its a bit bigger than I originally thought. I may end up dropping the diff down, or shifting it to the left to clear the trans.