Added recovery points to the front and rear bumpers, cladding to cover the unibody in the rear, rock slides, a front skid plate, and the snorkel. The snorkel is directly fed into the MAF which opens up nearly two cubic feet where the airbox was. This will give me room to out in a 120 amp deep cell battery later this month. The winch, CB radio, and 12v fridge will all run directly off this battery.
I am hoping that on Monday I will be able to start the buildout of the shelf/drawer and kitchen setup in the back.
At the end of the month we're taking off the factory roof rack and building a custom job for a popup tent, and lots of offroad gear. We will also be installing a hood mount for the hi-lift jack, and I hope to do some painting of the grill and hood.
I am planning on doing a month on the Trans America Trail starting September 5th... I have a lot to do before then!
More to come...