Been a while between getting stuff done on this, but the main bits are coming together.
The Troopy has been in for the new pop top that we were wanting so we could refresh the skirt and get a bit more height out of it!
We had the skirt made from weather max which is a lot lighter than the original canvas and looks the goods as well.
We're really happy with how it came out and managed to get about an extra 200mm out of it! The guys out at ADP did a great job on this.
From this..

To this..!
Up next is finalising the interior and getting all the plumbing and electrical work done..
The Troopy has been in for the new pop top that we were wanting so we could refresh the skirt and get a bit more height out of it!
We had the skirt made from weather max which is a lot lighter than the original canvas and looks the goods as well.
We're really happy with how it came out and managed to get about an extra 200mm out of it! The guys out at ADP did a great job on this.
From this..

To this..!

Up next is finalising the interior and getting all the plumbing and electrical work done..
Last edited: