geckoadventure
Geckoadventure
14 July 2018
LIfe been busy 5 days with the orphanage kids on a kayaking training camp then working last 3 weekends and next 2 sigh.
However meantime the freight company contacts me 12th July the Container arrives and delivery will be around 17th July.
The 13th 2pm I get a OCS message with pics on it the Cabin bottom has been delivered to the workshop. Wow less than 24 hours in dock and it's delivered.
I pop over after work and spend 90 minutes pulling the crate apart. The cabin looks immaculate.
Then Saturday I popped in and we move the cabin to the newly built Volvo 2 bay in the workshop
Any illussions on whether I should have bought the cabin are squashed by this pic.
Will be 3 weeks before I can do anything to Volvo 2.
LIfe been busy 5 days with the orphanage kids on a kayaking training camp then working last 3 weekends and next 2 sigh.
However meantime the freight company contacts me 12th July the Container arrives and delivery will be around 17th July.
The 13th 2pm I get a OCS message with pics on it the Cabin bottom has been delivered to the workshop. Wow less than 24 hours in dock and it's delivered.
I pop over after work and spend 90 minutes pulling the crate apart. The cabin looks immaculate.
Then Saturday I popped in and we move the cabin to the newly built Volvo 2 bay in the workshop
Any illussions on whether I should have bought the cabin are squashed by this pic.
Will be 3 weeks before I can do anything to Volvo 2.