Photomike
White Turtle Adventures & Photography
Road block day :sombrero: Got the lino trimmed for the bathroom floor and the floor dropped in and that was it.
I need to make a bathroom door and was trying to decide all day how to do it. Would prefer to buy something premade but size not anywhere close to standard so that is out. Came up with a game plan and now I need it to warm up a lot more before I can build it and install as I will need to pull the two walls to do it.
Also finally made a decision on the fridge, going to go with a Dometic CRX80 if they can get them in Canada, if not the CRX65 so will order that tomorrow, one of the suppliers said the 80's were not available but will check.
Electric is on hold at this time as running wires and hooking things up in the cold not my idea of a good time. I may have to make a road trip to my brother's as he is an electrician and he has large shops to work in, only problem is they are 9 hours away. :bike_rider::bike_rider::bike_rider:
I need to make a bathroom door and was trying to decide all day how to do it. Would prefer to buy something premade but size not anywhere close to standard so that is out. Came up with a game plan and now I need it to warm up a lot more before I can build it and install as I will need to pull the two walls to do it.
Also finally made a decision on the fridge, going to go with a Dometic CRX80 if they can get them in Canada, if not the CRX65 so will order that tomorrow, one of the suppliers said the 80's were not available but will check.
Electric is on hold at this time as running wires and hooking things up in the cold not my idea of a good time. I may have to make a road trip to my brother's as he is an electrician and he has large shops to work in, only problem is they are 9 hours away. :bike_rider::bike_rider::bike_rider: