So I read about other guys doing DIY build out's and it takes them months even, dare I say years, and I think. What takes you so long. Oh wow famous last words. Although I have been finishing and basement, building a shop, landscaping my back yard and now in the process of changing jobs, I don't really know where the time goes.
Now that the shop is built, it is a disaster as I have just been piling stuff inside. I guess I should set some "to do lists" to organize all the jobs better.
The following pictures are the basic layout of the "kitchen counter" there will be drawers and doors. I am also trying to save costs a little so for a sink I took my wife's largest mixing bowl, drilled it out and put a drain in it. Total about $16.00. Advantage is I took several other of her mixing bowls as they fit in my new sink and will work great for additional bowls as they nest inside each other.
![20160414_210232.jpg 20160414_210232.jpg](https://expeditionportal.com/forum/data/attachments/266/266126-f2ae0e66d03f8fad134520c34dbfa80f.jpg)
![20160414_210252.jpg 20160414_210252.jpg](https://expeditionportal.com/forum/data/attachments/266/266127-2a484dfe407ac31b8f6afc1e8e551cd0.jpg)
The lid over the porta potti lifts up and latches lifted up. I will try to add pictures of the sink installed. It actually is where the cook stove will be. I am also realizing I should have first washed the whole Wildernest as it is dirty and now I have to pull everything out and wash it, then stain the counter and re-install.
![20160414_210303.jpg 20160414_210303.jpg](https://expeditionportal.com/forum/data/attachments/266/266128-fe5a7b657cf12fa96781a072e3f36eca.jpg)
Now that the shop is built, it is a disaster as I have just been piling stuff inside. I guess I should set some "to do lists" to organize all the jobs better.
The following pictures are the basic layout of the "kitchen counter" there will be drawers and doors. I am also trying to save costs a little so for a sink I took my wife's largest mixing bowl, drilled it out and put a drain in it. Total about $16.00. Advantage is I took several other of her mixing bowls as they fit in my new sink and will work great for additional bowls as they nest inside each other.
![20160414_210232.jpg 20160414_210232.jpg](https://expeditionportal.com/forum/data/attachments/266/266126-f2ae0e66d03f8fad134520c34dbfa80f.jpg)
![20160414_210252.jpg 20160414_210252.jpg](https://expeditionportal.com/forum/data/attachments/266/266127-2a484dfe407ac31b8f6afc1e8e551cd0.jpg)
The lid over the porta potti lifts up and latches lifted up. I will try to add pictures of the sink installed. It actually is where the cook stove will be. I am also realizing I should have first washed the whole Wildernest as it is dirty and now I have to pull everything out and wash it, then stain the counter and re-install.
![20160414_210303.jpg 20160414_210303.jpg](https://expeditionportal.com/forum/data/attachments/266/266128-fe5a7b657cf12fa96781a072e3f36eca.jpg)