The Ironman kit came in last week and it was installed the very next day

I also replaced all front control arms (bushings and ball joints included), stabilizer links and bushings, wheel bearing hubs, water pump, timing belt, (all pullies and actuator), drive belt with tensioner and all pullies, thermostat, all coolant hoses, all fluids (engine oil,coolant, front/rear diff, t case, trans, power steering, brake fluid). I even filled both front and rear washer fluid resevoirs!
I threw on the new tires and had it aligned a few days ago. Unfortunately, I wasn't taking pictures because I was focused on getting the project completed in one weekend. Luckily I had the help of my uncle who donated the use of his fully equipped garage and assisted me when needed.
Here are a few pics I took this morning at a construction site near me. I live in Toronto and there aren't any decent trails for a 100km. I'll make sure I take some next time I go north.