Made great strides tonight. Mounted the axle, wheel spacers, wheels/tires and shocks. Cut holes for 6" LED's in rear C channel, welded up the front hitch channel and Bulldog jack and did some touchup painting. Need to run wiring and the frame is finished. Next up is the bed.
Here's a few pics:
Cut off the lower shock mounts from the military axle, actually they are just barely welded on front and rear. We decided not to weld on the new axle as it really doesn't matter, more for locating during assembly than anything. Mounted up the axle.
The AllPro spacer/adapters are almost too nice to hide, bolted them on and coated everything that needed it.
Flipped it over, coated what I missed and bolted up the FJ wheels and tires. The fit was perfect.
Now she rolls...
My modified shocks bolted right on.
Helps to have friends who are world class welders. Cutting the holes for the LED's.
a little fine cutting here and there and poof...taillights.
Welded up the hitch channel and the bulldog jack mount. I didn't bolt up either as I had to get some coating and paint on the front first.
So basically I now have a rolling frame. Next is wiring, bolt on missing pieces and chains, helicopter lift rings, etc. I figure a couple more evenings once the bed is cleaned and undercoated, get the bed mounted and I'll see about painting the sides and lining the bed. Once that's finished I'll deal with fuel cans, and other various addons.