#24
(above) Instead of the barbed hose connections, threaded, braided stainless steel rubber hoses were installed...
(above) The cover plate for the primary kitchen outlets got labeled...Each circuit is separate...
(above) Another duplex AC outlet was cut into the end panel of the kitchen cabinet...A router jig makes the cutting of the hole easy...
(above) The inlet fitting for the blue-water tank...The adhesive is 3M 5200...
(above) The outlet hole in the blue-water tank...A hose will go through the pipe connecting the bottom of the tank to the water pump inlet...
(above) The grey water drain outlet fitting...
(above) The cabinets are getting permanently installed now...
(above) Looking down beyond where the cooktop will be, beyond where the microwave will be, are the water heater and the water tanks...
(above) On the sink side of the kitchen cabinet it looks like this...You can see the supplemental webbing straps to further keep the tanks from moving...Also, the inside of the kitchen cabinet got a complete coat of paint...
(above) The pull-out-fold-over table top is now permanent...
(above) Folded over and layered in fresh dust...
(above) Microwave, in...
(above) Tight spaces are the normal in builds like this...I got lucky to get water tanks that fit the spaces without going to custom...
(above) The inlet fitting on the water pump housing snapped off...Hand tightened, no wrenches...Grrrrrrr...
(above) A big hole was drilled in the middle level of plywood to allow the wiring from under the bed to pass through...Simple masking tape labeling will be appreciated later...
(above) Then it was off to get the countertop...Here, Tyler fine tunes the line at the back edge of the stone where it meets the wall by the window...
(above) Loosely set...The induction cooktop could not look better...
(above) Stainless steel undermount sink...
(above) The lift up Plexiglass panel covers the electrical panel...
(above) The toilet is a low-boy...To facilitate usage, a riser box was built...
(above) In use the seat height will be about 17"...It will be painted before it's all done...