Visually frame looks sleek and it is progressing, though slowly. Springs are yet to be delivered and installed, then the final paint. Anyway given the experience of the engineering workshop in making rural water tankers on spring mounted frames and the design seen and approved by certified engineer, I should have confidence in the engineering side, though time will tell.
Thanks guys for taking interest in my build. It is interesting to see the discussion and different views which gives insight on various approaches in this regard. .
Today measurements are taken for the panels, so need to spend some time on the internal design and the location of windows, door, hatch doors etc.