Sorry I haven't had much for updates lately. There have been a few updates I'll post pics of below. I can't believe it but we are actually at that stage where we are waiting on good weather to bring the egg out of the garage to finish. We can't install the rooftop fan or the rack inside because the camper will not clear the garage door so the rest will need to be done outdoors. After the rack is installed, we have the solar panel to mount to it and wire up, along with the pod lights. We also have a front rock guard for over the window to install and the tires and wheels. Other than that, dare I say we just might be done!
As for recent updates, we added insulation everywhere we could access and as far up between the two shells as was possible. Hopefully this will help with any condensation issues that might arise. Not sure why the manufacturer didnt think insulation was necessary?
I finally got around to painting the wheel inserts red to match the ones on my jeep. I also painted all of the window frames a gloss black as they got a bit scratched up upon removing and reinstalled all of the windows. Hubby welded some tie off points on the rack for strapping down our kayaks and some light mounts on all four corners for led pod lights. We have already ran the wiring to two switches inside the door that will functon the rear and front lights seperately. Oh, I also got some propane tank covers to make em look a little cooler. I originally wanted to paint the tanks red but my husband brought up a good point that its easier to find a place to switch out tanks than to fill them when we are on the road so I found these magnetic cover things. Cheap enough at $13ea so we will try em out I guess. Oh I redid the floor inside also. I don't have a pic but I didnt like the wood like vinyl entry by the door that I did before. It seemed to throw off my whole look so I ordered another roll of the foam I used on the rest of the flooring and redid the layout so the seam falls under the bed now (where you don't see it) instead of by the front door which is what prompted the different flooring at the entry. I like it much better now that it is all uniform. I think that is pretty much all we have done. Like I said, just waiting on some nicer warmer weather days to finish this project up! Next update will be from outside!