Bit of a slow go, but hacking away at it pretty steadily. The duct work has been installed, I'll post those pictures and details when I get it tidied up. The lower compartments are nearly complete, and ready to install the power outlets into.
The inner main cabinet is painted and ready to start on the fronts next. Lots of painting, staining, watching paint dry. Pretty stoked to have these parts almost 100% complete. The upper compartments aren't in the picture, but they will look identical, in color, to the lower compartments. The walls are new(I ditched the luan). They have a red oak veneer, and I stained them with a 50/50 mix of Minwax Ebony and Classic grey.
Sent from my XT1650 using Tapatalk