Get your tickets to THE BIG THING 2026!








Wow, what a yard. Those 30s cars are beauts.
Did you consider a 5z engine before getting the 3z?
Toiyabe said:The list:
Remove ADD actuator and clamp.
Drain and fill front diff.
Remove ADD solenoids, vacuum reservoir, and lines.
Remove engine mounts and transmission support brackets from old engine and clean. Install on new engine.
Clean driver's side of oil pan and block and paint.
Install new oil filter.
Remove exhaust manifolds, intake manifold, crank pulley, timing belt pulleys and sheet metal, and all sensors from old engine.
Move old engine off stand.
Remove flex plate and transmission plate from new engine.
Put new engine on stand.
Remove intake plenum and wiring harness.
Swap injectors and rails to new engine.
Paint plenum.
Remove valve covers and paint. Reseal.
Install new timing belt, water pump, rollers, and clean and reinstall all sheet metal.
Reinstall crank pulley.
Install better of two fan brackets.
Weld up old fittings for egr and pair. Install.
Install new spark plugs.
Install all brackets for lifting and misc.
Install engine.
Install transplate and flywheel.
Clean transmission.
Reseal transfer case output flange.
Install transmission and transfer case.
Install cross member.
Attach AC compressor to engine.
Attach PS pump to engine.
Attach starter and alternator to engine.
Attach wiring harness.
Install plenum and throttle body.
Install correct heater hoses.
Finish vacuum hose reroute.
Connect evap system.
Install distributor, cap, rotor, and wires.
Install shifters.
Attach wires to transmission.
Attach front driveshaft.
Install front Aisin manual hubs.
Remove fuel tank.
Repair fuel feed line to filter - fabricate new.
Reinstall tank.
Install rear driveshaft.
Fill transmission and transfer case.
Drain and fill rear axle.
Attach downpipe and catalytic converter.
Measure for new muffler and tail pipe.
Install fan clutch and fan.
Install drive belts and tension.
Install radiator and hoses.
Install air cleaner assembly and AFM.
Remove EGR intake.
Fill with oil and coolant.
Install 10k ohm resistor in EGR temp sensor connector.
Install positive battery terminal.
Install battery with new hold down.
Start.
Attach hood.
Attach front bumper more securely.
Build exhaust.
Clean truck.














































































