We finished building (still needs varnishing) the platform for the table pedestal. I still need to build the 2 floor panels that will be hinged on each side, sort of waiting on those for when I do the flooring. The "fids" are also in place around the seating area. In the back right corner is the house battery compartment, the larger compartment closer is for the freezer. There will be another wall forward to separate the freezer from the electrical panels which will be in the face on the right side.
I ordered the water tank today from Duraweld in Florida, should be ready in a few weeks. It is 1/2" welded polypropylene in an L shape.
Tomorrow I will finish the wall between the freezer and electrical panel. Will also make the backing plates for the inverter/charger that will be mounted under the left bench on the kitchen counter wall.
Had a minor change in plan and ordered up both AC and DC Blue Seas electrical panels. Got what seemed to be a great price from Overtons. Strange, Overtons wharehouse is about a 20 minute drive way, for some strange reason the shipping is going to take Fedex SmartPost over a week to get here...