I've been working in the yard these past few days trying to take care of tree root problems, and decided I needed a diversion. So I spent the day at my friends shop working on the trailer. In order to make sure all four sides were the same length and all, I started by leveling the trailer, once I had that done I created a story pole to set up my max closed height (my garage door is only 79" high, so I have to be under that). Next I figured out where the uprights would be mounted and measured from there to my max height which ended up being 63.5". So I subtracted the height of the tent (in stowed configuration) and came up with 37.5 (for the rear). that being done, I clamped it in place, leveled it, then measured the total height from the floor (63.5") then tack welded it in place. Once that was done, I did the same for the other side. The front was done the same, except the length on the supports was a little shorter, however, the overall height was the same as the rear.
Once all four posts were in place and tack welded, I inserted the stabilizing legs, which look like they will work well for keeping the tent stable.
The next thing I need to work out is the tent lift mechanism. I have been working on some drawings, but I haven't finalized anything yet.
This is one of my ideas. Once the tent is in the upright position, I will use braces attached to the lower frame to secure it.
As I mentioned before, I want to be able to walk under the tent when it is deployed, which means that the tent lift mechanism will need to lift the tent at least 18". I'll keep working on it.
Happy trails!