Next added insulation to the attic and to the crawl space.....August 11, 2021.....
And was able to close in that new side wall with a sliding glass door.....
And after the electricity was in, started on the drywall.....probably the worst job of the entire cabin build.....August 12, 2021.....
Once the drywall was complete, I started adding reclaimed wood to the walls.....August 25, 2021.....
I installed overhead fans in the bedroom and the great room.....August 27, 2021.....
Once the first reclaimed wood wall was installed, I hired a guy to install the propane stove.....
The bathroom tile and all the flooring was installed that summer by Luis.....my Mexican friend. I didn't know him before the start of this project.....now we've been friends for four years. I spoke with him just yesterday and it pains me to hear him say that he now lives everyday in fear as he and his wife are both here on green cards (for over 20 years). He has 2 children born in America.....everyday now they fear being deported.....September 8, 2021.....
His work is of the highest quality.....he's a stickler for perfection.....
Luis also installed my kitchen cabinets and bathroom vanity.....