slimtwo
Adventurer
So, today I worked on the tongue. I needed to drill the holes for the hitch, and I needed to cut a slot in the side of the tube for the wiring harness to exit. And my friend recommended that I slot the top and bottom of the end of the tongue, to be able to clamp the end over the hitch, in order to eliminate any movement, which translates to noise.
Once I accomplished all of that, I tacked the tongue in place. Once I verified that it was true, I welded it in place.
I have ordered two new wheels, which will go with the old trailer when I sell it (the old wheels match the jeep, and will get new shoes and be mounted on the new trailer). I have ordered the wiring harness and J box. One of the next things I will order is the fresh water tank. The tank will be 25 gals., 38” wide by 20.5” long, and 8.5 “High. (The tank will be mounted differently than my original diagram shows it). I will be working on fabricating mounts for the tank, and the batteries, which is also on the list. If anyone has a suggestion for batteries, I am looking at what is available. and they need to hold up to the abuse they will get.
That’s a wrap for today.
Happy Trails!
Once I accomplished all of that, I tacked the tongue in place. Once I verified that it was true, I welded it in place.
I have ordered two new wheels, which will go with the old trailer when I sell it (the old wheels match the jeep, and will get new shoes and be mounted on the new trailer). I have ordered the wiring harness and J box. One of the next things I will order is the fresh water tank. The tank will be 25 gals., 38” wide by 20.5” long, and 8.5 “High. (The tank will be mounted differently than my original diagram shows it). I will be working on fabricating mounts for the tank, and the batteries, which is also on the list. If anyone has a suggestion for batteries, I am looking at what is available. and they need to hold up to the abuse they will get.
That’s a wrap for today.
Happy Trails!