The Adam Blaster
Expedition Leader
Texted back and forth with Randy today, no action yet on the build. He's been busy vacating his garage of his other side projects to make room for mine.
He mentioned that he's going to take the steel for the frame to his work place and get everything cut and welded up there in one night. Industrial grade equipment = mo better and faster than consumer level stuff.
He mentioned that he's going to take the steel for the frame to his work place and get everything cut and welded up there in one night. Industrial grade equipment = mo better and faster than consumer level stuff.