deminimis
Explorer
Went as high as I could go due to the front fuel sump with repositioning it. I used 2x2x1/4 angle for my plasma cutting guide (you can see it in the first photo above, behind the fuel sump hole). 2x4x1/4 bridged between crossmembers provided the mounting spots for the inners. For outers, I welded in 2 x1/4 behind the FB edge for a flat surface. 1x1/4 keeps the front suspended (not seen in the pics). Bolts front and rear, outside top corners, will keep the boxes from moving forward and aft (washers will be used to tune the front spacing between the cutouts. I do have to reposition the rear inner mount as it is too far in (any excuse to fire up the plasma cutter). Due to the arm's length laundry list I still have to complete, I may not get the driver's side box installed. If weather holds up (not windy), I may have a chance. I have to reposition the bracket and complete the waste valve nightmare tonight. Tomorrow, I have to do another 250mi round trip to pick up the large boxes for the deck, install a new solar controller, etc. And for you welders out there, yes, I welded a "C" clamp in place once yesterday (not the first time, nor the last I'm sure).
First box test fit (not fully seated and not fully forward):
Bottom is well above the muffler. Once I raise the bed, I'll have ample clearance.
First box test fit (not fully seated and not fully forward):
Bottom is well above the muffler. Once I raise the bed, I'll have ample clearance.
Last edited: