aaaslayer
Active member
morning, a little update from over the weekend. Bedrug is on and loving it. Insulation started, need to finish up both side hatches and 1 more barn door. Will require some fancy cuts to work around the locking latches. Ceiling needs insulation too. Reflectix will go over the foam boards once all done. Then coroplast. Then bench storage. Need to place my fridge and power bank in place to see how I'm going to build these storage benches. Not sure if I want to build a storage bench that'll house my fridge too, or just strap the fridge in place with L track somewhere in the middle between both storage benches, or on top of the storage benches. I'll decide once insulation job is complete.
Last edited: