Well its been awhile since I posted, I have been working alot of the trailer and it's finally ready for paint... Just to recap, this is suppose to go where ever the jeep can go. It will have two sections that rise up on electric screw lifts, the first shell will create a 6'ft high space in the center of the trailer that is basically a full bathroom. Above that another section will rise creating an "attic" that you will climb into from inside the bathroom. It will have a height of about 4' and there will be two twin beds on either side of a 24" hatch. On the outside there will be a full pull out kitchen. The trailer will carry 35 gals of fresh water and another 5gal bottle of drinking water. There is still so much to do I not sure it will ever be done... stay tuned for some better pics once some of the pannels are attached... cheers