red EOD veteran
Adventurer
On friday did some prep work for the engine swap, about 1/3rd of the way complete. Pulled both alternators, the air take, radiator, fan, fuel and air lines. Cleaned the oil from the passenger side of the engine bay as well. Still need to pull wiring, transmission shifter, driveshaft between the transmission and the transfercase, front bumper, and the motor mounts. Then clean everything up after the motor is out. The plan is to pull the old engine/trans out and install the new parts over a weekend in late august/early September.