Se7en62
Adventure Seeker
After another couple days of trial and error (not being an A/C guy) GROOT is blowing ice cold. In fact it's so cold that I had to turn the fan down this morning and adjust the vent so it wasn't freezing my hand on the steering wheel. - This weekend it will get it's windows all tinted to help maintain interior temps.
Tonight I'll install the new Pioneer speakers I picked up for next to nothing, then I'll start putting together the parts I need to convert the Chrysler 8.25 to discs. - The A/C ate so far into my time constraints and budget that the axle swaps will have to come after our trip to CO. Since that's the case, my new prioritized prep list is as follows:
25 Days and Counting...
Tonight I'll install the new Pioneer speakers I picked up for next to nothing, then I'll start putting together the parts I need to convert the Chrysler 8.25 to discs. - The A/C ate so far into my time constraints and budget that the axle swaps will have to come after our trip to CO. Since that's the case, my new prioritized prep list is as follows:
- Disc Brake Conversion for Chrysler 8.25 w/ New E-Brake Cable ($295)
- Fabricate Rock Sliders ($60)
- Finish Tucking Rear Quarter Panels
- Front Wheel Bearings and U-Joints ($98)
- Finish CB System ($73)
- Recovery Points ($80)
- Upgrade Engine Mounts ($104) <--Not needed, but I'd like these done in advance of the trip.
- Window Tinting ($120)
- Parachord Pet & Cargo Dividers (Wife is on it.)
- Build a Cargo Compartment System for Pelican Cases and RTIC Cooler ($40)
- Pelican Cased CO2 System ($165)
- Pelican Cased Field-Repair Tool Kit ($24 for Tool Roles)
25 Days and Counting...
Last edited: