villageidiot327
Explorer
more work today, these are the steps that take time, but don't photograph well at all. so heres a basic rundown of what we did
1: sanded the bottom of the floor plywood/poly with 220, and give it a thick second coat...... no pics.
2: sand all sides of the "boxes" with 220, and put 2 coats back to back on the birch pieces
3: rough cut the flooring, smear a whole tub of flooring adhesive onto the plywood, and lay out the floor, trim to fit after it set up for a little while
4: sand all the box pieces again with 220 grit, and give it a 3rd coat. kinda messed up, brushed what i thought was wet, but it was dry ish, but thats why we started with the inside of the boxes. it'll be more than ok, in fact, might not be a big deal at all. will not be putting another coat on the insides.
1: sanded the bottom of the floor plywood/poly with 220, and give it a thick second coat...... no pics.
2: sand all sides of the "boxes" with 220, and put 2 coats back to back on the birch pieces


3: rough cut the flooring, smear a whole tub of flooring adhesive onto the plywood, and lay out the floor, trim to fit after it set up for a little while



4: sand all the box pieces again with 220 grit, and give it a 3rd coat. kinda messed up, brushed what i thought was wet, but it was dry ish, but thats why we started with the inside of the boxes. it'll be more than ok, in fact, might not be a big deal at all. will not be putting another coat on the insides.


