Here are some photos from a very long day yesterday, had to setup a light on a ladder over my work table. The Teak install process is just really slow, and I suffered a setback due to a snapped screw that forced me to take out the passenger side panel to extract the screw. All of the screws used in the build are hardened 410 stainless steel and have been sooo much safer to use than regular stainless steel screws. I have installed hundreds of them in this build and this was the first one to fail. I was hoping to get the rear wall panel installed as well but just couldn't get there. It did get it to the point where it is ready to install, so I'm going to try to get home early enough to install it today.
The finished insulation on the business side of the camper.
Here is the teak on the driver side. Shame most of this will just be the back wall inside the casework.
Here is the rear wall completed and ready for teak.
Hopefully I'll be installing the roof in the next couple of weeks.