I had a very productive day, I took off the original tray fitted by the dealer and then trial fitted the subframe I built for my overland camper.
It was a long day and hard work but very rewarding milestone in my build.
The subframe fit really well and I am completing the fit out of the subframe ready for it to go to the powder coater for surface treatment.
once this portion of the build is complete I can start making the walls of the camper.......
watch this space.
https://www.youtube.com/watch?v=X1p0zptsgSQ
It was a long day and hard work but very rewarding milestone in my build.
The subframe fit really well and I am completing the fit out of the subframe ready for it to go to the powder coater for surface treatment.
once this portion of the build is complete I can start making the walls of the camper.......
watch this space.
https://www.youtube.com/watch?v=X1p0zptsgSQ